Description
-
- Diameter: Around 90 cm
- Removable in 6 parts
- Material: Tubular Steel + NBR Foam, very resistant to cracking
- Installation steps of steel pipe hoop
- The first section installation method:
①. Laminate the two nozzles up and down.
-
- ②. One section is fixed, turn the other section and slightly push to the middle.
-
- ③. Keep rotating, when the bayonet of section 2 is fully aligned, the tube will automatically be inserted into the part.
-
- ④. Press the convex point of the tube and continue to insert it, and the 2 sections are closed with a click.
-
- ⑤. Pull the next 2 pipes to check whether the installation is firm, and continue to install the next section according to this method.
-
- Installation method in the last section: Put the fitness circle upright on the ground, with the unmerged 2 sections at the top, grasp the 2 sections and press them down gently. When the nozzles of the 2 sections are aligned, you can insert it.













Reviews
There are no reviews yet.